v. BODELSCHWINGH´SCHE ANSTALTEN Biogas Plant
Location | Germany |
Construction Period | 1991 |
Input | Manure, kitchen waste |
Fermenter | Steel tank, 100 m3 |
Gas utilization | Dual fuel co-generator, 27 kWel |
Specials | Digester, gas bag |
Responsibility | Assembly of tubes, pumps, mixers, heating and gas systems |