Location | Argentina, Rio Cuarto |
Construction Period | 2017/18 |
Input | Thin stillage (corn silage, vinasses), a residual material from ethanol production |
Fermenter | Glass coated steel tank, 8,000 m³ |
Gas utilization | total: 2,927 kWel: 1,200 kWel in CHP; 1,727 kWel in a boiler for internal consumption of the bioethanol process |
Specials | Digester, secondary digester with gas holder roof, reception tank, solid input device, external desulphurization |
Responsibility | Basic evaluation, pre-, draft- and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up, training for operators |
Datasheet | |
Reports | |